A new roof covering application can be dangerous, but a lucrative job. Precautionary steps ought to be considered loss defense. Most rooves, nonetheless, are not extremely steep as well as can be changed by an able-bodied homeowner. If more than one layer of roof shingles already exists, elimination will be needed, which will call for a huge trailer or unload the truck. After removal, all existing nails will be driven and harmed wood changed. A layer of felt paper, 30 # recommended will certainly after that be related to cover bare wood. When using felt paper, start at the bottom of the roofing system utilizing lines of paper to retain a straight run.

To mark off home for roof shingles begin near the bottom by noting 11 inches up. This will certainly allow for a one-inch hangover. Off your 11 inch mark, step at the very least every 10 inches. Do so on each end of the surface area panel you will certainly be the roof. Utilize a high-quality chalk line, preferably with red chalk, to stand outlines between the marks. On a saddleback roof, measure 29″ and 35″ for your upright lines. This will certainly leave the required 6″ stagger in between roof shingles. This is typically referred to as a bonline. On a hip roof covering, a woodworker’s square can be made use of to attain a vertical line, as well as by measuring 6 inches over on top and also bottom the bonline is full.

We are currently prepared to start laying shingles. An inverted shingle can be used for the starter run. A grain of tar one-quarter of an inch thick is needed in high wind locations along the bottom edge. The starter tile needs to contend at least 4 nails [6 in high wind areas such as along the shore] When using the roof shingles you should alternate between both online [this is the reason for 2 upright lines.] The rain grooves will after that have a 6-inch stagger.

Fasteners [nails] are used over each rain groove, below the tar line. Bolts on the end of each three-tab roof shingles must be precisely one inch from completion. In high wind applications, 2 nails are required over each rainfall groove, one on each side, no further than one inch from the main groove. When the top is gotten to, the ridge cap is applied. Cut three-tab shingles into one tab. Begin on side of the house that receives the least wind, as well as lay one tab over the other down the ridge, leaving a five-inch exposure on each. Attach tabs one inch from completion, additionally below the tar line.

Valleys can be tied in 2 fashions. I recommend the laced valley. When lacing a valley just the same principles use as in a level run, yet make sure each shingle prolongs a complete 12 inches across the valley. If the shingle does not reach the 12-inch mark a 1 tab will need to be added, a little overlapping the complete tile. According to the incline of the valley different patterns will certainly need to be used to maintain the intersection factor as near to the facility of the valley as possible.

On a cut valley, one side of the valley is shingled as well as permitted to prolong a complete 12 inches across the valley. Then the opposite side is laid. The larger side is laid 2nd. A two-inch mark is made on top and bottom of the valley, on the smaller side. Aline is popped in between the two as well as the roof shingles are reduced. A bead of tar ought to be put under the cut edge of the tiles.